This is an image of the street widening construction project on the 40 block of Division Ave S. The view is to the north towards the Fulton Street intersection. In this image, it appears that the tracks are possibly being removed or repaired.
This is an image of the street widening construction project on the 200 block of Division Ave S. The view is to the north and it appears that the tracks are possibly being replaced.
This is an image of the street widening construction project on Division Ave S downtown Grand Rapids at the intersection of Division Ave S and Fulton St E.
This is an image of the street widening construction project on Division Ave S in the 140 block near the intersection of Cherry Street looking north. Liberty Lunch is on the left and Chaffee Brothers can be seen to the right down the street.